13th ICOLD International Benchmark Workshop on Numerical Analysis of Dams
Event details
Date | 09.09.2015 › 11.09.2015 |
Location | |
Category | Conferences - Seminars |
With 1500 hydropower plants and over 150 large dams (of which 25 over 100 m high), Switzerland is a hub for Dam Engineering and the Energy Sector. Hydropower account for 59 percent of the domestic electricity supply. The Swiss Federal Office of Energy (SFOE) requires that Owners verify their schemes including “dams” for seismic loading. By 2015, a vast majority of seismic verifications shall have been performed in accordance with the most recent Guidelines published by the SFOE thus representing a milestone in Swiss Dam Engineering.
The Benchmark is jointly organized by Swiss Committee on Dams and the ICOLD - Committee on Computational Aspects of Analysis and Design of Dams at EPFL, from 9th to the 11th September 2015. It sets a framework for Engineers, Owners and Scientists, to perform and share their experiences for predefined themes and on an Open theme dedicated to Dam Safety.
The Benchmark is jointly organized by Swiss Committee on Dams and the ICOLD - Committee on Computational Aspects of Analysis and Design of Dams at EPFL, from 9th to the 11th September 2015. It sets a framework for Engineers, Owners and Scientists, to perform and share their experiences for predefined themes and on an Open theme dedicated to Dam Safety.
Links
Practical information
- General public
- Registration required
Organizer
- LCH
Contact
- Gesualdo Casciana